Cat's Whisker
Satellite Allocation

NGSO constellation Q-band gateway downlinks

37.5–42.5 GHz
5 GHz wide · Extremely high frequency
Modes
DIGITAL, DVB-S2X, ACM
Allocation
Primary
Region
Worldwide
Service
Fixed-satellite (space-to-Earth)
Licence
ITU filing plus national earth-station licence
Power
epfd limits per RR Article 22 protect geostationary networks
Confidence
Medium
Importance
●●●○○

Where megaconstellations plan to move their gateway traffic once Ka gateway spectrum runs out.

SpaceX, Amazon's Project Kuiper, Telesat Lightspeed and dozens of filed-but-unbuilt systems all hold or seek authorisations for Q/V-band feeder links, downlinking at 37.5-42.5 GHz and uplinking at 47.2-50.2 and 48.2-50.2 GHz. The logic is simple: user terminals need Ka, and there is not enough Ka gateway spectrum in dense markets to feed thousands of satellites, so the gateways move up. Non-geostationary systems must respect equivalent power flux density limits in RR Article 22 that protect geostationary networks, which constrains how they schedule beams near the geostationary arc. Ground sites are typically clusters of several 3-5 m antennas with site diversity to ride out rain.

Inside this band

Part of

Nearby

Sources